Our Pricing

Pricing Policy

Due to Covid, inflation, labor costs/shortages and supply chain issues, we are all faced with pricing volatility. Pricing for each plan is based on if that model were built today* with our standard finishes and inclusions. Since our plans are already pre-designed, this will cut down the time from contract signing to build date and hopefully mitigate further price increases that could occur down the road for a longer design and permitting process. Our pricing for one of our 6 predesigned value-engineered options includes the structure itself, exterior entry landing (raised foundation) or concrete pad (slab on grade) as per plan specifications, design and complete plans: architectural, structural, Title 24 report, permit processing, individually metered electrical upgrade (does not include SDG&E fees) and required solar for your ADU as per the Zone 7 chart that can be found on the “What’s included?” page. There are other costs that you will incur out of pocket including city permit fees, school fees, impact fees (for units 750 sq. ft. and above), soil reports (recommended, may not be required based on jurisdiction), site work, upgraded utilities, water/sewer connection fees, and potentially upgraded finish fees, fire sprinklers, septic system, title report and survey. Please refer to our "Other Costs" page for more details. Once final permits are approved and we are ready to build, you will be provided with final price.  Please refer to our “What’s included?” page to get a detailed list of what our pricing includes.

* Based on current pricing September 1, 2022. Due to volatility in material and labor costs and supply chain issues, pricing may change.

Our Quotation Process

In order to provide pricing transparency for our clients, we follow the schedule below to determine final pricing:

  • Initial Meeting

    Free in-person site consult at your property. An initial feasibility study indicating the size of ADU that can be built will be provided. We will assess for potential permit fees, utility upgrades and site work.

  • Contract Signing

    Once the contract is signed and deposit is received, our consulting team will do a more in-depth feasibility study and site review.

  • Final Pricing

    Once all permits are approved and we are ready to begin construction, we will confirm our final pricing to build the structure which includes solar and site work. Signing this final agreement will lock in pricing.